feature/FOUR-15682: Set up the DueDate in run request according the configuration in the task. by luNunezProcessmaker · Pull Request #6944 · ProcessMaker/processmaker

Issue & Reproduction Steps

In a execution of a request needs to read the configuration dueIn and update with the value. If the dynamic variable does not exist, the default show be kept as 72 hours.

Related Tickets & Packages

Code Review Checklist

  • I have pulled this code locally and tested it on my instance, along with any associated packages.
  • This code adheres to ProcessMaker Coding Guidelines.
  • This code includes a unit test or an E2E test that tests its functionality, or is covered by an existing test.
  • This solution fixes the bug reported in the original ticket.
  • This solution does not alter the expected output of a component in a way that would break existing Processes.
  • This solution does not implement any breaking changes that would invalidate documentation or cause existing Processes to fail.
  • This solution has been tested with enterprise packages that rely on its functionality and does not introduce bugs in those packages.
  • This code does not duplicate functionality that already exists in the framework or in ProcessMaker.
  • This ticket conforms to the PRD associated with this part of ProcessMaker.

ci:next
ci:deploy
ci:processmaker-bpmn-moddle:feature/FOUR-15508