feature/FOUR-15682: Set up the DueDate in run request according the configuration in the task. by luNunezProcessmaker · Pull Request #6944 · ProcessMaker/processmaker
Issue & Reproduction Steps
In a execution of a request needs to read the configuration dueIn and update with the value. If the dynamic variable does not exist, the default show be kept as 72 hours.
Related Tickets & Packages
Code Review Checklist
- I have pulled this code locally and tested it on my instance, along with any associated packages.
- This code adheres to ProcessMaker Coding Guidelines.
- This code includes a unit test or an E2E test that tests its functionality, or is covered by an existing test.
- This solution fixes the bug reported in the original ticket.
- This solution does not alter the expected output of a component in a way that would break existing Processes.
- This solution does not implement any breaking changes that would invalidate documentation or cause existing Processes to fail.
- This solution has been tested with enterprise packages that rely on its functionality and does not introduce bugs in those packages.
- This code does not duplicate functionality that already exists in the framework or in ProcessMaker.
- This ticket conforms to the PRD associated with this part of ProcessMaker.
ci:next
ci:deploy
ci:processmaker-bpmn-moddle:feature/FOUR-15508