CI Reliability 2025-05-31

Failures in node-test-pull-request/67099 to node-test-pull-request/67198 that failed 2 or more PRs
(Generated with ncu-ci walk pr --stats=true --markdown reports/2025-05-31.md)

UTC Time RUNNING SUCCESS UNSTABLE ABORTED FAILURE Green Rate
2025-05-31 00:11 1 20 19 1 59 20.41%

Open https://github.com/nodejs/reliability/blob/main/reports/2025-05-31.md to see failure details

Progress

  • Build timed out (after 30 minutes). Marking the build as failed. (4)
  • Build timed out (after 60 minutes). Marking the build as failed. (2)
  • fatal: No rebase in progress? (2)
  • parallel/test-http2-debug (17)
  • parallel/test-buffer-tostring-range (5)
  • pummel/test-blob-slice-with-large-size (5)
  • wpt/test-streams (4)
  • async-hooks/test-improper-order (3)
  • async-hooks/test-improper-unwind (2)
  • parallel/test-runner-run-watch (2)
  • parallel/test-stream-readable-to-web (2)
  • sequential/test-performance-eventloopdelay (2)
  • sequential/test-tls-session-timeout (2)