List of commercial nuclear reactors
From Wikipedia, the free encyclopedia
This article is about commercial nuclear fission reactors. For other nuclear reactor lists, see List of nuclear reactors.
This is a dynamic list and may never be able to satisfy particular standards for completeness. You can help by editing the page to add missing items, with references to reliable sources.
This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2025, there are 439 operable power reactors in the world, with a combined electrical capacity of 397.7 GW. Additionally, there are 68 reactors under construction and 108 reactors planned, with a combined capacity of 74 GW and 103 GW, respectively, while 359 more reactors are proposed.[1] For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[2]
In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[3]
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Atucha[4] | 1 | PHWR | Siemens-KWU | Operation suspended (under maintenance) |
362 | 1 Jun 1968 | 24 Jun 1974 | |
| 2 | PHWR | Siemens-KWU | Operational | 745 | 14 Jul 1981 | 27 Jun 2014 | ||
| 3 | PWR | Hualong One | Planned[5] | 1200 | ||||
| Embalse[6] | 1 | PHWR | CANDU-6 | Operational | 683 | 1 Apr 1974 | 20 Jan 1984 | (2049)[7] |
| CAREM | 1 | PWR | CAREM25 | Under construction | 25 | 8 Feb 2014 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Metsamor | 1 | PWR | VVER-440/V-270 | Shut down | 376 | 1 Jul 1969 | 6 Oct 1977 | 25 Feb 1989 |
| 2 | PWR | VVER-440/V-270 | Operational | 375 | 1 Jul 1975 | 3 May 1980 | (2036)[8] |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Zwentendorf | 1 | BWR | BWR-69 (KWU) | Finished; never entered service | 878 | Apr 1972 | 5 Nov 1978 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Rooppur | 1 | PWR | VVER-1200/V-523 | Under construction | 1080 | 30 Nov 2017[9] | (2026)[10] | |
| 2 | PWR | VVER-1200/V-523 | Under construction | 1080 | 14 Jul 2018 | (2027) |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Ostrovets | 1 | PWR | VVER-1200/V-491 | Operational | 1109 | 6 Nov 2013 | 10 Jun 2021[11] | |
| 2 | PWR | VVER-1200/V-491 | Operational | 1109 | 24 Apr 2014 | 1 Nov 2023[12] | ||
| Minsk | 1 | PWR | VVER-1000 | Unfinished | 963 | 1983 | 1987 | |
| 2 | PWR | VVER-1000 | Unfinished | 963 | 1983 | 1987 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| SCK•CEN | 1 | PWR | Westinghouse (WH) BR-3 | Decommissioned | 10 | 1 Nov 1957 | 10 Oct 1962 | 30 Jun 1987 |
| Doel | 1 | PWR | WH 2 loops | Shut down | 445 | 1 Jul 1969 | 15 Feb 1975 | 14 Feb 2025 |
| 2 | PWR | WH 2 loops | Shut down | 445 | 1 Sep 1971 | 1 Dec 1975 | 30 Nov 2025 | |
| 3 | PWR | Framatome 3 loops | Shut down | 1006 | 1 Jan 1975 | 1 Oct 1982 | 23 Sep 2022[13] | |
| 4 | PWR | Belgian firms plus WH 3 loops | Operational | 1039 | 1 Dec 1978 | 1 Jul 1985 | (1 Nov 2035) | |
| Tihange | 1 | PWR | Framatome 3 loops | Shut down | 962 | 1 Jun 1970 | 1 Oct 1975 | 1 Oct 2025 |
| 2 | PWR | Framatome 3 loops | Shut down | 1008 | 1 Apr 1976 | 1 Jun 1983 | 31 Jan 2023[14] | |
| 3 | PWR | Belgian firms plus WH 3 loops | Operational | 1046 | 1 Nov 1978 | 1 Sep 1985 | (1 Nov 2035) |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Angra | 1 | PWR | WH 2 loops | Operational | 609 | 1 May 1971 | 1 Jan 1985 | |
| 2 | PWR | Pre-Konvoi | Operational | 1275 | 1 Jan 1976 | 1 Feb 2001 | ||
| 3 | PWR | Pre-Konvoi | Under construction | 1245 | 1 Jun 2010 | (2028)[15] |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Kozloduy | 1 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Apr 1970 | 28 Oct 1974 | 31 Dec 2002 |
| 2 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Apr 1970 | 10 Nov 1975 | 31 Dec 2002 | |
| 3 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Oct 1973 | 20 Jan 1981 | 31 Dec 2006 | |
| 4 | PWR | VVER-440/V-230 | Shut down | 408 | 1 Oct 1973 | 20 Jun 1982 | 31 Dec 2006 | |
| 5 | PWR | VVER-1000/V-320 | Operational | 1003 | 9 Jul 1980 | 23 Dec 1988 | ||
| 6 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Apr 1982 | 30 Dec 1993 | ||
| 7 | PWR | AP1000 | Planned[16] | 1150 | (2033)[16] | |||
| 8 | PWR | AP1000 | Planned[16] | 1150 | ||||
| Belene | 1 | PWR | VVER-1000/V-320 VVER-1000/V-446B |
Unfinished | 953 1011 |
1987 2008 |
||
| 2 | PWR | VVER-1000/V-320 VVER-1000/V-446B |
Unfinished | 953 1011 |
1987 2008 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Pickering | 1 | PHWR | CANDU 500A | Shut down | 515 | Jun 1966 | 29 Jul 1971 | 1 Oct 2024 |
| 2 | PHWR | CANDU 500A | Shut down | 515 | Sep 1966 | 30 Dec 1971 | 31 Dec 1997[17] | |
| 3 | PHWR | CANDU 500A | Shut down | 515 | Dec 1967 | 1 Jun 1972 | 29 Dec 1997 | |
| 4 | PHWR | CANDU 500A | Shut down | 515 | May 1968 | 17 Jun 1973 | 31 Dec 2024 | |
| 5 | PHWR | CANDU 500B | Operational | 516 | Nov 1974 | 10 May 1983 | (2026) | |
| 6 | PHWR | CANDU 500B | Operational | 516 | Oct 1975 | 1 Feb 1984 | (2026) | |
| 7 | PHWR | CANDU 500B | Operational | 516 | Mar 1976 | 1 Jan 1985 | (2026) | |
| 8 | PHWR | CANDU 500B | Operational | 516 | Sep 1976 | 28 Feb 1986 | (2026)[18] | |
| Darlington | 1 | PHWR | CANDU 850 | Operational | 878 | Apr 1982 | 14 Nov 1992 | (2052) |
| 2 | PHWR | CANDU 850 | Operational | 878 | Sep 1981 | 9 Oct 1990 | (2050) | |
| 3 | PHWR | CANDU 850 | Operational | 878 | Sep 1984 | 14 Feb 1993 | (2053) | |
| 4 | PHWR | CANDU 850 | Operational | 878 | Jul 1985 | 14 Jun 1993 | (2053) | |
| 5[19] | BWR | BWRX-300 | Under construction | 300 | 8 May 2025[20] | (2030) | ||
| 6[19] | BWR | BWRX-300 | Planned | 300 | ||||
| 7 | BWR | BWRX-300 | Planned | 300 | ||||
| 8 | BWR | BWRX-300 | Planned | 300 | ||||
| Bruce | 1 | PHWR | CANDU 791 | Operational | 823 | Jun 1971 | 1 Sep 1977 | (2043) |
| 2 | PHWR | CANDU 791 | Operational | 823[21] | Dec 1970 | 1 Sep 1977 | (2043) | |
| 3 | PHWR | CANDU 750A | Operational | 817 | Jul 1972 | 1 Feb 1978 | (2064)[22] | |
| 4 | PHWR | CANDU 750A | Operational | 817 | Sep 1972 | 18 Jan 1979 | (2064) | |
| 5 | PHWR | CANDU 750B | Operational | 817 | Jun 1978 | 1 Mar 1985 | (2064) | |
| 6 | PHWR | CANDU 750B | Operational | 880[23] | Jan 1978 | 15 Sep 1984 | (2064) | |
| 7 | PHWR | CANDU 750B | Operational | 817 | May 1979 | 10 Apr 1986 | (2064) | |
| 8 | PHWR | CANDU 750B | Operational | 817 | Aug 1979 | 22 May 1987 | (2064) | |
| NPD | 1 | PHWR | CANDU | Shut down | 19 | Jan 1958 | 4 Jun 1962 | 1 Aug 1987 |
| Douglas Point | 1 | PHWR | CANDU 200 | Shut down | 200 | Feb 1960 | 26 Sep 1968 | 4 May 1984 |
| Gentilly | 1 | BWR | CANDU BLWR 250 | Shut down | 250 | Sep 1966 | 1 May 1972 | 1 June 1977 |
| 2 | PHWR | CANDU-6 | Shut down | 635 | Apr 1974 | 1 Oct 1983 | 28 Dec 2012 | |
| Point Lepreau | 1 | PHWR | CANDU-6 | Operational | 635 | May 1975 | 1 Feb 1983 | (2041) |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Juragua | 1 | PWR | VVER-440/V-318 | Unfinished | 440 | 1983 | 5 Sep 1992 | |
| 2 | PWR | VVER-440/V-318 | Unfinished | 440 | 1985 | 5 Sep 1992 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Dukovany | 1 | PWR | VVER-440/V-213 | Operational | 468 | 1 Jan 1979 | 3 May 1985 | |
| 2 | PWR | VVER-440/V-213 | Operational | 471 | 1 Jan 1979 | 21 Mar 1986 | ||
| 3 | PWR | VVER-440/V-213 | Operational | 468 | 1 Mar 1979 | 20 Dec 1986 | ||
| 4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Mar 1979 | 19 Jul 1987 | ||
| 5 | PWR | APR-1400 | Planned | 1200 | ||||
| 6 | PWR | APR-1400 | Planned | 1200 | ||||
| Temelín | 1 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Feb 1987 | 10 Jun 2002 | |
| 2 | PWR | VVER-1000/V-320 | Operational | 1003 | 1 Feb 1987 | 18 Apr 2003 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| El Dabaa | 1 | PWR | VVER-1200/V-529 | Under construction | 1200 | 20 Jul 2022[62] | (2028) | |
| 2 | PWR | VVER-1200/V-529 | Under construction | 1200 | 19 Nov 2022[63] | |||
| 3 | PWR | VVER-1200/V-529 | Under construction | 1200 | 3 May 2023[64] | |||
| 4 | PWR | VVER-1200/V-529 | Under construction | 1200 | 23 Jan 2024 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW)[65] |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Hanhikivi | 1 | PWR | VVER-1200/V-491 | Cancelled | 1200 | (2023) | (2029) | 2 May 2022[66][67] |
| Loviisa | 1 | PWR | VVER-440/V-213 | Operational | 507 | 1 May 1971 | 9 May 1977 | |
| 2 | PWR | VVER-440/V-213 | Operational | 507 | 1 Aug 1972 | 5 Jan 1981 | ||
| Olkiluoto | 1 | BWR | ASEA-III, BWR-2500 | Operational | 890 | 1 Feb 1974 | 10 Oct 1979 | |
| 2 | BWR | ASEA-III, BWR-2500 | Operational | 890 | 1 Nov 1975 | 10 Jul 1982[68] | ||
| 3 | PWR | EPR | Operational | 1600 | 12 Aug 2005 | 1 May 2023[69] |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Paks | 1 | PWR | VVER-440/V-213 | Operational | 470 | 1 Aug 1974 | 10 Aug 1983 | |
| 2 | PWR | VVER-440/V-213 | Operational | 473 | 1 Aug 1974 | 14 Nov 1984 | ||
| 3 | PWR | VVER-440/V-213 | Operational | 473 | 1 Oct 1979 | 1 Dec 1986 | ||
| 4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Oct 1979 | 1 Nov 1987 | ||
| 5 | PWR | VVER-1200 | Under construction | 1114 | 5 Feb 2026[75] | |||
| 6 | PWR | VVER-1200 | Planned | 1114 | (2026) |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Bushehr | 1 | PWR | VVER-1000/V-446 | Operational | 915 | 1 May 1975 | 23 Sep 2013 | |
| 2 | PWR | VVER-1000/V-528 | Under construction | 915 | 27 Sep 2019 | |||
| 3 | PWR | VVER-1000 | Planned | 915 | ||||
| Darkhovin | 1 | PWR | Unfinished; restart planned | 360 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Caorso | 1 | BWR | BWR-4 Mark2 | Shut down/in decommissioning | 860 | 1 Jan 1970 | 1 Dec 1981 | 1 Jul 1990 |
| Enrico Fermi | 1 | PWR | WH 4-loop | Shut down/in decommissioning | 260 | 1 Jul 1961 | 1 Jan 1965 | 1 Jul 1990 |
| Garigliano | 1 | BWR | BWR-1 | Shut down/in decommissioning | 150 | 1 Nov 1959 | 1 Jun 1964 | 1 Mar 1982 |
| Latina | 1 | GCR | Magnox | Shut down/in decommissioning | 153 | 1 Nov 1958 | 1 Jan 1964 | 1 Dec 1987 |
| Montalto | 1 | BWR | Unfinished | 982 | 1 Jul 1982 | 1 Jan 1988 | ||
| 2 | BWR | Unfinished | 982 | 1 Jul 1982 | 1 Jul 1988 | |||
| Trino 2 [IT] | 1 | PWR | Unfinished | 950 | 23 Dec 1987 | |||
| 2 | PWR | Unfinished | 950 | 23 Dec 1987 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Aktau | 1 | FBR | BN-350 | Shut down/in decommissioning | 350 | 1 Oct 1964 | 16 Jul 1973 | 22 Apr 1999 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Ignalina | 1 | LWGR | RBMK-1500 | Shut down/in decommissioning | 1185 | 1 May 1977 | 31 Dec 1983 | 31 Dec 2004 |
| 2 | LWGR | RBMK-1500 | Shut down/in decommissioning | 1185 | 1 Jan 1978 | Aug 1987 | 31 Dec 2009 | |
| 3 | LWGR | RBMK-1500 | Unfinished | 1185 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Laguna Verde | 1 | BWR | BWR-5 | Operational | 804 | 1 Oct 1976 | 28 Jul 1990 | |
| 2 | BWR | BWR-5 | Operational | 800 | 1 Jun 1977 | 10 Apr 1995 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Borssele | 1 | PWR | KWU 2LP | Operational | 482 | 1 Jul 1969 | 26 Oct 1973 | (2033) |
| Dodewaard | 1 | BWR | BWR-2 | Shut down | 55 | 1 May 1965 | 26 Mar 1969 | 26 Mar 1997 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Yongbyon | 1 | GCR | Magnox (Pu-production) | Shut down[citation needed] | 5[citation needed] | 1994 | ||
| 2 | LWR[89] | Planned[89] | 30 | |||||
| Taechon | 1 | Unfinished | 200 | 1994 | ||||
| Kumho | 1 | PWR | Unfinished | 1000 | 2003 | |||
| 2 | PWR | Unfinished | 1000 | 2003 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Chashma | 1 | PWR | CNP-300 | Operational | 300 | 1 Aug 1993 | 15 Sep 2000 | |
| 2 | PWR | CNP-300 | Operational | 300 | 28 Dec 2005 | 18 May 2011 | ||
| 3 | PWR | CNP-300 | Operational | 315 | 28 May 2011 | 6 Dec 2016 | ||
| 4 | PWR | CNP-300 | Operational | 313 | 18 Dec 2011 | 19 Sep 2017 | ||
| 5 | PWR | Hualong One | Under construction | 1100 | 30 Dec 2024 | |||
| Karachi | 1 | PHWR | CANDU | Shut down | 90 | 1 Aug 1966 | 7 Dec 1972 | 1 Aug 2021 |
| 2 | PWR | Hualong One | Operational | 1014 | 23 May 2013 | 19 Mar 2021[90] | ||
| 3 | PWR | Hualong One | Operational | 1014 | 31 May 2016 | 18 Apr 2022 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Bataan | 1 | PWR | Westinghouse | Unfinished; restart planned[91] | 621 | 1976 | 1986 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Żarnowiec | 1 | PWR | VVER-440 | Unfinished | 440 | 31 Mar 1982 | 4 Sep 1990 | |
| 2 | PWR | VVER-440 | Unfinished | 440 | 31 Mar 1982 | 4 Sep 1990 | ||
| 3 | PWR | VVER-440 | Cancelled | 440 | ||||
| 4 | PWR | VVER-440 | Cancelled | 440 | ||||
| Lubiatowo-Kopalino[92] | 1 | PWR | AP1000 | Planned | 1250[93] | (2026) | (2033)[94] | |
| 2 | PWR | AP1000 | Planned | 1250 | (2035–2036)[94] | |||
| 3 | PWR | AP1000 | Planned | 1250 | (2037–2039)[94] | |||
| Pątnów[95] | 1 | PWR | APR-1400 | Planned | 1340 | |||
| 2 | PWR | APR-1400 | Planned | 1340 | ||||
| Włocławek | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[96] | ||
| Ostrołęka | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[96] | ||
| Warsaw | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[96] | ||
| Tarnobrzeg/Stalowa Wola | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[96] | ||
| Dąbrowa Górnicza | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[96] | ||
| Stawy Monowskie | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[96] | ||
| Kraków | 1 | BWR | BWRX-300 | Planned | 300 | (2030)[96] |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Cernavodă | 1 | PHWR | CANDU-6 | Operational | 650 | 31 Mar 1983 | 2 Dec 1996 | |
| 2 | PHWR | CANDU-6 | Operational | 650 | 1 Jul 1983 | 1 Nov 2007 | ||
| 3 | PHWR | CANDU-6 | Unfinished; restart planned | 650 | ||||
| 4 | PHWR | CANDU-6 | Unfinished; restart planned | 650 | ||||
| 5 | PHWR | CANDU-6 | Unfinished | 650 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Bohunice | A-1[116] | HWGCR | KS 150 | Decommissioned | 93 | 1 Aug 1958 | 25 Dec 1972 | 22 Feb 1977 |
| 1[117] | PWR | VVER-440/V-230 | Shut down | 408 | 24 Apr 1972 | 1 Apr 1980 | 31 Dec 2006 | |
| 2 | PWR | VVER-440/V-230 | Shut down | 408 | 24 Apr 1972 | 1 Jan 1981 | 31 Dec 2008 | |
| 3 | PWR | VVER-440/V-213 | Operational | 472 | 1 Dec 1976 | 14 Feb 1985 | (2045) | |
| 4 | PWR | VVER-440/V-213 | Operational | 471 | 1 Dec 1976 | 18 Dec 1985 | (2045) | |
| Mochovce | 1 | PWR | VVER-440 V-213 | Operational | 436 | 13 Oct 1983 | 29 Oct 1998 | (2058) |
| 2 | PWR | VVER-440/V-213 | Operational | 436 | 13 Oct 1983 | 11 Apr 2000 | (2060) | |
| 3 | PWR | VVER-440/V-213 | Operational | 440 | 27 Jan 1987 | 17 Oct 2023[118] | ||
| 4 | PWR | VVER-440/V-213 | Under construction | 440 | 27 Jan 1987 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Krško | 1 | PWR | WH 2 loops | Operational | 688 | 30 Mar 1975 | 1 Jan 1983 | (2043)[119] |
| 2 | PWR | TBD | Planned | 1100 | (2030)[120] |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Koeberg | 1 | PWR | CP1 (France) | Operational | 930 | 1 Jul 1976 | 21 Jul 1984 | |
| 2 | PWR | CP1 (France) | Operational | 930 | 1 Jul 1976 | 9 Nov 1985 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation (planned) |
Closed |
|---|---|---|---|---|---|---|---|---|
| Hanbit | 1 | PWR | WH F | Operational | 960 | 4 Jun 1981 | 25 Aug 1986 | |
| 2 | PWR | WH F | Operational | 958 | 10 Dec 1981 | 10 Jun 1987 | ||
| 3 | PWR | OPR-1000 | Operational | 997 | 23 Dec 1989 | 31 Mar 1995 | ||
| 4 | PWR | OPR-1000 | Operational | 997 | 26 May 1990 | 1 Jan 1996 | ||
| 5 | PWR | OPR-1000 | Operational | 997 | 29 Jun 1997 | 21 May 2002 | ||
| 6 | PWR | OPR-1000 | Operational | 995 | 20 Nov 1997 | 24 Dec 2002 | ||
| Hanul | 1 | PWR | CP1 (France) | Operational | 960 | 26 Jan 1983 | 10 Sep 1988 | |
| 2 | PWR | CP1 (France) | Operational | 962 | 5 Jul 1983 | 30 Sep 1989 | ||
| 3 | PWR | OPR-1000 | Operational | 994 | 21 Jul 1993 | 11 Aug 1998 | ||
| 4 | PWR | OPR-1000 | Operational | 998 | 1 Nov 1993 | 31 Dec 1999 | ||
| 5 | PWR | OPR-1000 | Operational | 996 | 1 Oct 1999 | 29 Jul 2004 | ||
| 6 | PWR | OPR-1000 | Operational | 996 | 29 Sep 2000 | 22 Apr 2005 | ||
| Shin-Hanul | 1 | PWR | APR-1400 | Operational | 1340 | 10 Jul 2012 | 7 Dec 2022[121] | |
| 2 | PWR | APR-1400 | Operational | 1340 | 19 Jul 2012 | 5 Apr 2024[122] | ||
| 3 | PWR | APR-1400 | Under construction[123] | 1340 | 20 May 2025 | (2032) | ||
| 4 | PWR | APR-1400 | Planned | 1340 | (2033) | |||
| Kori | 1 | PWR | WH 60 | Shut down | 576 | 27 Apr 1972 | 29 Apr 1978 | 18 Jun 2017 |
| 2 | PWR | WH F | Operational | 640 | 4 Dec 1977 | 25 Jul 1983 | ||
| 3 | PWR | WH F | Operational | 1011 | 1 Oct 1979 | 30 Sep 1985 | ||
| 4 | PWR | WH F | Operational | 1012 | 1 Apr 1980 | 29 Apr 1986 | ||
| Shin-Kori | 1 | PWR | OPR-1000 | Operational | 996 | 16 Jun 2006 | 28 Feb 2011 | |
| 2 | PWR | OPR-1000 | Operational | 996 | 5 Jun 2007 | 20 Jul 2012 | ||
| Saeul | 1 | PWR | APR-1400 | Operational | 1416 | 16 Oct 2008 | 15 Jan 2016 | |
| 2 | PWR | APR-1400 | Operational | 1418 | 19 Aug 2009 | 29 Aug 2019[124] | ||
| 3 | PWR | APR-1400 | Under construction | 1400 | 1 Apr 2017 | |||
| 4 | PWR | APR-1400 | Under construction | 1400 | 20 Sep 2018 | |||
| Wolsong | 1 | PHWR | CANDU-6 | Shut down | 657 | 30 Oct 1977 | 22 Apr 1983 | 24 Dec 2019 |
| 2 | PHWR | CANDU-6 | Operational | 655 | 22 Jun 1992 | 1 Jul 1997 | ||
| 3 | PHWR | CANDU-6 | Operational | 684 | 17 Mar 1994 | 1 Jul 1998 | ||
| 4 | PHWR | CANDU-6 | Operational | 688 | 22 Jul 1994 | 1 Oct 1999 | ||
| Shin-Wolsong | 1 | PWR | OPR-1000 | Operational | 991 | 20 Nov 2007 | 31 Jul 2012 | |
| 2 | PWR | OPR-1000 | Operational | 960 | 23 Sep 2008 | 26 Feb 2015 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Almaraz | 1 | PWR | WH 3 loops | Operational | 1011 | 3 Jul 1973 | 1 Sep 1983 | |
| 2 | PWR | WH 3 loops | Operational | 1006 | 3 Jul 1973 | 1 Jul 1984 | ||
| Ascó | 1 | PWR | WH 3 loops | Operational | 995 | 16 May 1974 | 10 Dec 1984 | |
| 2 | PWR | WH-3 loops | Operational | 997 | 7 Mar 1975 | 31 Mar 1986 | ||
| Cofrentes | 1 | BWR | BWR-6 | Operational | 1064 | 9 Sep 1975 | 11 Mar 1985 | |
| José Cabrera | 1 | PWR | WH 1 loop | Shut down/in decommissioning | 141 | 24 Jun 1964 | 13 Aug 1969 | 30 Apr 2006 |
| Lemoniz | 1 | PWR | Unfinished | 1972 | 1984 | |||
| 2 | PWR | Unfinished | 1972 | 1984 | ||||
| Santa María de Garoña | 1 | BWR | BWR-3 | Shut down/in decommissioning | 446 | 11 May 1971 | 15 Feb 1975 | 6 Jul 2013 |
| Trillo | 1 | PWR | KWU 3 loops | Operational | 1003 | 17 Aug 1979 | 6 Aug 1988 | |
| Valdecaballeros | 1 | BWR | Unfinished | 1975 | 1984 | |||
| 2 | BWR | Unfinished | 1975 | 1984 | ||||
| Vandellòs | 1 | GCR | UNGG | Shut down/in decommissioning | 480 | 1967 | 2 Aug 1972 | 31 Jul 1990 |
| 2 | PWR | WH 3 loops | Operational | 1045 | 29 Dec 1980 | 8 Mar 1988 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed | |
|---|---|---|---|---|---|---|---|---|---|
| Ågesta | 1 | PHWR | R3 | Shut down/in decommissioning | 10 | 1 Dec 1957 | 1 May 1964 | 2 Jun 1974 | [a] |
| Barsebäck | 1 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Feb 1971 | 1 Jul 1975 | 30 Nov 1999 | [b] |
| 2 | BWR | ASEA-II | Shut down/in decommissioning | 600 | 1 Jan 1973 | 1 Jul 1977 | 31 May 2005 | [c] | |
| Forsmark | 1 | BWR | ASEA-III, BWR-2500 | Operational | 986 | 1 Jun 1973 | 10 Dec 1980 | [d] | |
| 2 | BWR | ASEA-III, BWR-2500 | Operational | 1116 | 1 Jan 1975 | 7 Jul 1981 | [e] | ||
| 3 | BWR | ASEA-IV, BWR-3000 | Operational | 1167 | 1 Jan 1979 | 18 Aug 1985 | [f] | ||
| Oskarshamn | 1 | BWR | ASEA-I | Shut down/in decommissioning | 473 | 1 Aug 1966 | 6 Feb 1972 | 19 Jun 2017 | [g] |
| 2 | BWR | ASEA-II | Shut down/in decommissioning | 638 | 1 Sep 1969 | 1 Jan 1975 | 22 Dec 2016 | [h] | |
| 3 | BWR | ASEA-IV, BWR-3000 | Operational | 1450 | 1 May 1980 | 15 Aug 1985 | [i] | ||
| Marviken | 1 | BHWR | R4 | Unfinished | 196 | 1 Apr 1965 | 27 May 1970 | [j] | |
| Ringhals | 1 | BWR | ASEA-I | Shut down/in decommissioning | 881 | 1 Feb 1969 | 1 Jan 1976 | 31 Dec 2020 | [k] |
| 2 | PWR | WH 3-loops | Shut down/in decommissioning | 904 | 1 Oct 1970 | 1 May 1975 | 30 Dec 2019 | [l] | |
| 3 | PWR | WH 3-loops | Operational | 1062 | 1 Sep 1972 | 9 Sep 1981 | [m] | ||
| 4 | PWR | WH 3-loops | Operational | 1104 | 1 Nov 1973 | 21 Nov 1983 | [n] |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed[130] |
|---|---|---|---|---|---|---|---|---|
| Beznau | 1 | PWR | WH 2-loops | Operational | 365 | 1 Sep 1965 | 1 Sep 1969 | (2029) |
| 2 | PWR | WH 2-loops | Operational | 365 | 1 Jan 1968 | 1 Dec 1971 | (2031) | |
| Gösgen | 1 | PWR | KWU 3-loops | Operational | 1010 | 1 Dec 1973 | 1 Nov 1979 | |
| Leibstadt | 1 | BWR | BWR-6 | Operational | 1220 | 1 Jan 1974 | 15 Dec 1984 | |
| Lucens | 1 | HWGCR | HWGCR | Decommissioned | 6 | 1 Apr 1962 | 29 Dec 1966 | 21 Jan 1969 |
| Mühleberg | 1 | BWR | BWR-4 | Shut down/in decommissioning | 373 | 1 Mar 1967 | 6 Nov 1972 | 20 Dec 2019 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Jinshan | 1 | BWR | BWR-4 | Shut down/in decommissioning | 636 | 2 Jun 1972 | 10 Dec 1978 | 3 Oct 2018 |
| 2 | BWR | BWR-4 | Shut down/in decommissioning | 636 | 7 Dec 1973 | 15 Jul 1979 | 3 Oct 2018 | |
| Kuosheng | 1 | BWR | BWR-6 | Shut down | 985 | 19 Nov 1975 | 28 Dec 1981 | 1 Jul 2021[131] |
| 2 | BWR | BWR-6 | Shut down | 985 | 15 Mar 1976 | 16 Mar 1983 | 15 Mar 2023 | |
| Lungmen | 1 | BWR | ABWR | Unfinished | 1350 | 31 Mar 1999 | 27 April 2014 [132] | |
| 2 | BWR | ABWR | Unfinished | 1350 | 30 Aug 1999 | 27 April 2014 [132] | ||
| Maanshan | 1 | PWR | WH 312 3-loop | Shut down | 951 | 21 Aug 1978 | 27 Jul 1984 | 28 Jul 2024 |
| 2 | PWR | WH 312 3-loop | Shut down | 951 | 21 Feb 1979 | 18 May 1985 | 17 May 2025 |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Akkuyu | 1 | PWR | VVER-1200/V-509 | Under construction | 1114 | 3 Apr 2018 | (2026)[133] | |
| 2 | PWR | VVER-1200/V-509 | Under construction | 1114 | 8 Apr 2020 | (2027) | ||
| 3 | PWR | VVER-1200/V-509 | Under construction | 1114 | 10 Mar 2021 | (2027) | ||
| 4 | PWR | VVER-1200/V-509 | Under construction | 1114 | 21 Jul 2022[134] | (2028) | ||
| Sinop[135] | 1 | PWR | VVER-1200 | Planned | 1110 | |||
| 2 | PWR | VVER-1200 | Planned | 1110 | ||||
| 3 | PWR | VVER-1200 | Planned | 1110 | ||||
| 4 | PWR | VVER-1200 | Planned | 1110 | ||||
| İğneada[136][137] | 1 | PWR | AP1000 | Planned | 1110 | |||
| 2 | PWR | AP1000 | Planned | 1110 | ||||
| 3 | PWR | CAP1400 | Planned | 1500 | ||||
| 4 | PWR | CAP1400 | Planned | 1500 |
United Arab Emirates
[edit]
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Barakah | 1 | PWR | APR-1400 | Operational | 1345 | 19 Jul 2012 | 6 Apr 2021[142] | |
| 2 | PWR | APR-1400 | Operational | 1345 | 16 Apr 2013 | 24 Mar 2022[143] | ||
| 3 | PWR | APR-1400 | Operational | 1345 | 24 Sep 2014 | 24 Feb 2023[144] | ||
| 4 | PWR | APR-1400 | Operational | 1345 | 30 Jul 2015 | 5 Sep 2024[145] |
| Plant name |
Unit No. |
Type | Model | Status | Capacity (MW) |
Begin building |
Commercial operation |
Closed |
|---|---|---|---|---|---|---|---|---|
| Plant in the Jizzakh Region | 1 | PWR | RITM-200N | Planned | 55 | |||
| 2 | PWR | RITM-200N | Planned | 55 | ||||
| 3 | PWR | RITM-200N | Planned | 55 | ||||
| 4 | PWR | RITM-200N | Planned | 55 | ||||
| 5 | PWR | RITM-200N | Planned | 55 | ||||
| 6 | PWR | RITM-200N | Planned | 55 |
- Economics of nuclear power plants
- Integrated Nuclear Fuel Cycle Information System
- List of nuclear power stations
- List of boiling water reactors
- List of largest power stations
- List of small modular reactor designs
- List of nuclear reprocessing sites
- Lists of nuclear disasters and radioactive incidents
- Nuclear power by country
- Nuclear power reactors in Europe
- ^ The full reactor model name is R3/Adam.[125]
- ^ The full reactor model name is ASEA-ATOM Gen II.[126]
- ^ The full reactor model name is ASEA-ATOM Gen II.[126]
- ^ The full reactor model name is ASEA-ATOM Gen III,[126] BWR-2500,[126] BWR 69.[127]
- ^ The full reactor model name is ASEA-ATOM Gen III,[126] BWR-2500,[126] BWR 69.[127]
- ^ The full reactor model name is ASEA-ATOM Gen IV,[126] BWR-3000,[126] BWR 75.[127]
- ^ The full reactor model name is ASEA-ATOM Gen I.[126]
- ^ The full reactor model name is ASEA-ATOM Gen II.[126]
- ^ The full reactor model name is ASEA-ATOM Gen IV,[126] BWR-3000,[126] BWR 75.[128]
- ^ The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.[125]
- ^ The full reactor model name is ASEA-ATOM Gen I.[126] Closed at midnight on New Year's Eve.[129]
- ^ The full reactor model name is Westinghouse 3-loops.[126]
- ^ The full reactor model name is Westinghouse 3-loops.[126]
- ^ The full reactor model name is Westinghouse 3-loops.[126]
- ^ "World Nuclear Power Reactors & Uranium Requirements". world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
- ^ "PRIS – Home". pris.iaea.org.
- ^ "Reference Unit Power" at IAEA
- ^ "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 4 August 2019.
- ^ "China inks $8 bln nuclear power plant deal in Argentina". Reuters. 2 February 2022. Retrieved 2 February 2022.
- ^ Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
- ^ "The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years". BNamericas.com.
- ^ "Metsamor 2 to operate until 2036 : Corporate – World Nuclear News".
- ^ "Nuclear Power in Bangladesh – World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
- ^ "Лихачев рассказал, когда запустят первый энергоблок АЭС "Руппур"". РИА Новости (in Russian). 21 August 2025. Archived from the original on 21 August 2025. Retrieved 15 October 2025.
- ^ "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". rosatom.ru.
- ^ "Second Belarus unit enters commercial operation". world-nuclear-news.org.
- ^ "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 September 2022. Retrieved 25 September 2022.
- ^ "Second Belgian reactor enters retirement : Corporate - World Nuclear News".
- ^ a b c "Plans for New Nuclear Reactors Worldwide - World Nuclear Association".
- ^ a b c "Bulgaria to push ahead with two new units at Kozloduy". world-nuclear-news.org. World Nuclear News. 25 October 2023. Retrieved 3 November 2023.
- ^ "Utility abandons Pickering reactor overhaul". The Globe and Mail. 13 August 2005.
- ^ "Ontario extends Pickering operations". World Nuclear News. 30 September 2022. Retrieved 7 July 2023.
- ^ a b Patel, Sonal (2 December 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection". POWER Magazine. Retrieved 5 December 2021.
- ^ https://www.world-nuclear-news.org/articles/opg-gets-go-ahead-to-build-first-smr-in-canada
- ^ "Unit 2 sets record run ahead of planned maintenance outage". brucepower.com. 6 May 2022. Retrieved 7 July 2023.
- ^ "Life-Extension Program & MCR Project". brucepower.com. Retrieved 7 July 2023.
- ^ "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News".
- ^ a b "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 November 2019.
- ^ a b "我国自主三代核电华龙一号在海南正式开工建设". CNNC. Retrieved 2 April 2021.[permanent dead link]
- ^ "China's first Hualong One nuclear reactor starts commercial operations". Reuters. 30 January 2021. Retrieved 30 January 2021.
- ^ "Second Fuqing Hualong One enters commercial operation: New Nuclear – World Nuclear News".
- ^ "Second AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
- ^ "Fourth Chinese AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 13 January 2019.
- ^ "Construction starts on third Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 25 July 2022.
- ^ "Construction begins of fourth Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 26 April 2023.
- ^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 16 July 2018.
- ^ "Fifth Hongyanhe unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 2 August 2021.
- ^ "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 15 June 2018.
- ^ "Construction of Lufeng 5 gets under way". World Nuclear News. World Nuclear Association. Retrieved 9 September 2022.
- ^ "Construction of Lufeng 6 begins". World Nuclear News. World Nuclear Association. Retrieved 29 August 2023.
- ^ "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 5 January 2021.
- ^ "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". Retrieved 4 January 2022.
- ^ "First AP1000 reactor enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
- ^ "Sanmen 2 AP1000 enters commercial operation – World Nuclear News". world-nuclear-news.org. Retrieved 7 November 2018.
- ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 8 July 2022.
- ^ "Construction starts on fourth Sanmen unit". world-nuclear-news.org. Retrieved 23 March 2023.
- ^ "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News".
- ^ "Shidaowan Guohe One 1".
- ^ "Shidaowan Guohe One 2".
- ^ "Shidaowan 1".
- ^ a b "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 August 2019.
- ^ "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale". Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018.[permanent dead link]
- ^ "World's second EPR starts operations". Retrieved 10 September 2019.
- ^ "Fourth Tianwan unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
- ^ "Fifth Tianwan unit starts commercial operation". World Nuclear News. World Nuclear Association. Retrieved 9 September 2020.
- ^ "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News".
- ^ "Construction starts on eighth Tianwan unit: New Nuclear – World Nuclear News".
- ^ "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
- ^ "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 30 December 2020.
- ^ "Work on Xudabao unit 1 gets under way". world-nuclear-news.org. Retrieved 17 November 2023.
- ^ "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". ruscable.ru.
- ^ "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News".
- ^ "Yangjiang 5 enters commercial operation". world-nuclear-news.org. Retrieved 16 July 2018.
- ^ "Construction starts on first Zhangzhou unit – World Nuclear News". world-nuclear-news.org. Retrieved 18 October 2019.
- ^ "World's largest Hualong One nuclear power base successfully connects to State Grid". Retrieved 23 November 2025.
- ^ "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News".
- ^ "PRIS – Reactor Details".
- ^ "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News".
- ^ "Nuclear power plants in Finland". STUK. 6 April 2021. Retrieved 13 May 2022.
- ^ "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022.
- ^ "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022.
- ^ "PRIS – Reactor Details".
- ^ "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News".
- ^ https://www.reuters.com/business/energy/newest-french-reactor-faces-further-delays-due-new-issues-2025-04-11/
- ^ "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 9 December 2023.
- ^ a b "Germany shuts three of its last six nuclear plants". Retrieved 1 January 2022.
- ^ "German reactor permanently shut down". world-nuclear-news.org. Retrieved 10 May 2018.
- ^ "Germany shuts down Philippsburg 2". energycentral.com. Retrieved 8 January 2020.
- ^ "First concrete poured for Hungary's Paks II nuclear project". world-nuclear-news.org. 5 February 2026. Retrieved 8 February 2026.
- ^ "PRIS – Reactor Details".
- ^ "Genkai unit 4 supplying power again". world-nuclear-news.org. Retrieved 22 June 2018.
- ^ a b c d e f g "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute". genanshin.jp. Retrieved 3 October 2021.
- ^ "東通原子力発電所1号機の着工について". Tokyo Electric Power Company Holdings, Inc. Retrieved 27 June 2023.
- ^ "柏崎刈羽原発6号機が再稼働 東電の原発としては事故後初". NHK. Retrieved 21 January 2026.
- ^ "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)". fepc.or.jp. Retrieved 8 May 2018.
- ^ "40年超の美浜原発3号機が再稼働 原発事故後 全国初". NHK. Archived from the original on 23 June 2021. Retrieved 23 June 2021.
- ^ "Ohi No.4 reactor restarted- News – NHK WORLD – English". NHK WORLD. Archived from the original on 10 May 2018. Retrieved 10 May 2018.
- ^ "Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters". Reuters. Retrieved 29 October 2024.
- ^ "運転開始40年超高浜原発1号機 約12年ぶりに再稼働". Archived from the original on 28 July 2023. Retrieved 28 July 2023.
- ^ "Takahama 2 reactor restarted". Retrieved 15 September 2023.
- ^ "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters". Reuters. Retrieved 29 December 2019.
- ^ https://www.japantimes.co.jp/news/2025/04/30/japan/tomari-nuclear-plant-restart-approved
- ^ a b "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
- ^ "PRIS - Reactor Details".
- ^ "Philippines relaunches nuclear energy programme : Nuclear Policies". World Nuclear News. 3 March 2022. Retrieved 29 April 2022.
- ^ "Najważniejsze informacje – Polskie Elektrownie Jądrowe". pej.pl. Retrieved 15 February 2026.
- ^ "Poland's government confirms Westinghouse for nuclear plant". 4 November 2022.
- ^ a b c "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 October 2022.
- ^ "South Korea's KHNP signs letter of intent on Polish nuclear". 31 October 2022.
- ^ a b c d e f g "Taki reaktor chcą zbudować Orlen i Synthos". 18 April 2023.
- ^ "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
- ^ "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
- ^ "Кольскую АЭС-2 начнут строить в 2028 году". Retrieved 9 December 2023.
- ^ "Kursk's second unit retires after 45 years operation". Retrieved 31 January 2024.
- ^ "First Kursk II unit connected to the grid". world-nuclear-news.org. Retrieved 2 January 2026.
- ^ "Новак рассказал о сроках запуска первых двух блоков новой Курской АЭС-2". ПРАЙМ (in Russian). 11 September 2025. Retrieved 15 October 2025.
- ^ "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 April 2019.
- ^ "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
- ^ "Four New NPP Units Will be Built in Russia".
- ^ "Ленинградской атомной станции добавят мощности". 15 March 2024.
- ^ "На энергоблоке №4 Ленинградской АЭС-2 приступили к бетонированию фундамента реактора". neftegaz.ru (in Russian). 20 March 2025. Retrieved 21 March 2025.
- ^ "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 28 July 2021.
- ^ ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа". Interfax.ru (in Russian). Retrieved 3 September 2021.
- ^ "Russia plans new generation of FNPPS – Nuclear Engineering International". 6 January 2021.
- ^ a b "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". aem-group.ru. Archived from the original on 30 August 2022. Retrieved 30 August 2022.
- ^ "В Якутии собираются строить АЭС мощностью не менее 55 МВт".
- ^ ""Росатом" начал строительство реактора Брест-300 в Северске". 8 June 2021.
- ^ "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International". 26 June 2020.
- ^ "VVER units planned for Leningrad and Smolensk".
- ^ Shut down after a 1977 refuelling incident; decommission in progress since 1979
- ^ "Tlačová agentúra Slovenskej republiky – TASR.sk". tasr.sk. Archived from the original on 20 January 2009.
- ^ "Power commissioning of Mochovce 3 completed".
- ^ "Krško gets an overhaul : Corporate – World Nuclear News".
- ^ "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030" [The second block of NPP Krško could provide the first megawatts after 2030.]. Točka na I (in Croatian). 30 November 2022. Retrieved 14 April 2023.
- ^ "South Korean APR-1400 starts commercial operation : New Nuclear - World Nuclear News".
- ^ "Unit 2 at South Korean nuclear reactor enters commercial operation". 9 April 2024.
- ^ https://www.world-nuclear-news.org/articles/construction-of-new-korean-reactor-begins
- ^ "Second APR-1400 unit starts commercial operation". world-nuclear-news.org. Retrieved 3 September 2019.
- ^ a b "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 31 March 2007. Retrieved 12 January 2023.
- ^ a b c d e f g h i j k l m n o p "IAEA Sweden reactors". IAEA. 11 January 2023. Retrieved 12 January 2023.
- ^ a b c "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). April 2016. Retrieved 12 January 2023.
- ^ "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 January 2023.
- ^ "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 October 2020. Retrieved 29 December 2020.
- ^ admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine, 25 May 2011
- ^ "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 July 2021. Retrieved 29 April 2022.
- ^ a b "封存核四 馬英九:為下一代保留選擇權". 自由時報電子報 (in Chinese (Taiwan)). 27 April 2014. Retrieved 8 November 2024.
馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。
- ^ "Власти Турции заявили о планах запуска первого реактора на АЭС "Аккую" в 2026 г."
- ^ "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News".
- ^ https://www.bloomberght.com/bayraktar-sinop-nukleer-santrali-icin-rosatom-istekli-ve-onde-2356570
- ^ https://world-nuclear.org/information-library/country-profiles/countries-t-z/turkey
- ^ https://bigpara.hurriyet.com.tr/haberler/ekonomi-haberleri/sinop-ve-trakya-nukleer-santralleri-icin-tarih-belli-oldu_ID1614158/
- ^ "В Україні збудують нову атомну станцію: названо місто будівництва". GSMinfo. 22 September 2022. Retrieved 9 December 2023.
- ^ "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". xaec.org.ua. 12 February 2021. Archived from the original on 24 February 2021. Retrieved 7 November 2022.
- ^ "Ukraine begins construction of new units at Khmelnitsky NPP". 17 April 2024.
- ^ a b c "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO".
- ^ "UAE's first nuclear power plant begins commercial operations". Reuters. 6 April 2021. Retrieved 6 April 2021.
- ^ "Barakah / Unit 2 Begins commercial operations at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency". 23 February 2022.
- ^ "Third Barakah unit begins commercial operation : New Nuclear - World Nuclear News".
- ^ "UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations". 5 September 2024.
- ^ a b c d e f g h Ambrose, Jillian (4 December 2024). "Four of UK's oldest nuclear plants to run for even longer as Hinkley Point delayed". Retrieved 4 December 2024.
- ^ "Hinkley Point B enters retirement : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 2 August 2022.
- ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 25 July 2022.
- ^ "Hunterston B nuclear power station retires after 46 years in service". The Guardian. 7 January 2022.
- ^ "PRIS – Reactor Details". pris.iaea.org. Retrieved 24 January 2019.
- ^ "Wylfa nuclear power plant plans go ahead, creating Anglesey jobs". www.bbc.com. 13 November 2025. Retrieved 13 November 2025.
- ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
- ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
- ^ "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
- ^ "Brunswick-1". IAEA. Retrieved 14 April 2013.
- ^ "Brunswick-2". IAEA. Retrieved 14 April 2013.
- ^ "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 July 2021. Retrieved 29 April 2022.
- ^ "Idaho SMR project terminated". World Nuclear News. 9 November 2023. Retrieved 9 November 2023.
- ^ a b c d "TVA Prepares to Write Final Nuclear Chapters". American Nuclear Society. 17 April 2015. Archived from the original on 29 July 2023. Retrieved 5 October 2023.
- ^ a b c d e f g h Tennessee Valley Authority. "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park" (PDF). Archived from the original (PDF) on 5 January 2009. Retrieved 5 October 2023.
- ^ a b "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 April 2020. Archived from the original on 3 August 2020. Retrieved 30 April 2020.
- ^ "PRIS – Reactor Details".
- ^ StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine, 29 Dec 2014
- ^ "Vogtle Unit 3 goes into operation". Cision. 31 July 2023. Retrieved 31 July 2023.
- ^ "Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News".