refact: adjust hugegraph project structure to prepare for merge by VGalaxies · Pull Request #2266 · apache/hugegraph

added 2 commits

August 1, 2023 15:38

@imbajin imbajin linked an issue

Aug 3, 2023

that may be closed by this pull request

26 tasks

@imbajin imbajin linked an issue

Aug 3, 2023

that may be closed by this pull request

26 tasks

@VGalaxies

modify pom description as well

imbajin pushed a commit that referenced this pull request

Nov 8, 2023
#2338)

## Purpose of the PR

Subtask of #2265.

Adjust the project structure of this repository to include three sub-modules: hugegraph-server, hugegraph-pd, hugegraph-store at the root level.

## Main Changes

Roll back to the moment when #2266 was merged on `pd-store` and incorporate the latest changes in `master`.

For more detailed information, please refer to #2266 (comment).


---------

Co-authored-by: M <87920097+msgui@users.noreply.github.com>

VGalaxies added a commit to VGalaxies/incubator-hugegraph that referenced this pull request

Nov 10, 2023
apache#2338)

Subtask of apache#2265.

Adjust the project structure of this repository to include three sub-modules: hugegraph-server, hugegraph-pd, hugegraph-store at the root level.

Roll back to the moment when apache#2266 was merged on `pd-store` and incorporate the latest changes in `master`.

For more detailed information, please refer to apache#2266 (comment).

---------

Co-authored-by: M <87920097+msgui@users.noreply.github.com>

imbajin pushed a commit that referenced this pull request

Nov 10, 2023
#2338)

Subtask of #2265.

Adjust the project structure of this repository to include three sub-modules: hugegraph-server, hugegraph-pd, hugegraph-store at the root level.

Roll back to the moment when #2266 was merged on `pd-store` and incorporate the latest changes in `master`.

For more detailed information, please refer to #2266 (comment).

---------

Co-authored-by: M <87920097+msgui@users.noreply.github.com>

Vireo0512 pushed a commit to Vireo0512/incubator-hugegraph that referenced this pull request

Dec 15, 2025
…] (#2338)

## Purpose of the PR

Subtask of #2265.

Adjust the project structure of this repository to include three sub-modules: hugegraph-server, hugegraph-pd, hugegraph-store at the root level.

## Main Changes

Roll back to the moment when apache/hugegraph#2266 was merged on `pd-store` and incorporate the latest changes in `master`.

For more detailed information, please refer to apache/hugegraph#2266 (comment).


---------

Co-authored-by: M <87920097+msgui@users.noreply.github.com>